山東電纜橋架在接地處理時(shí)要注意哪些事項(xiàng)?

文章來源:http://www.ymmgjx.net/?? 作者:電纜橋架廠家發(fā)布時(shí)間:2021-07-23?瀏覽次數(shù):14

電纜橋架一般都安裝在室外或者一些高層建筑上,用來架設(shè)電纜,能夠?qū)﹄娎|起到一定的保護(hù)作用,山東電纜橋架在施工時(shí)需要有嚴(yán)格的規(guī)范進(jìn)行操作,那么具體的規(guī)范有哪些呢?接下來讓我們來一起了解一下。
Cable trays are generally installed outdoors or on some high-rise buildings to erect cables, which can play a certain role in protecting cables. Shandong cable trays need to be operated in strict specifications during construction. What are the specific specifications? Next, let's take a look.
1.山東電纜橋架在進(jìn)行接地施工時(shí)需要根據(jù)設(shè)計(jì)要求施工。如果對(duì)設(shè)計(jì)沒有具體要求,需要按照以下要求。
1. Shandong cable tray shall be constructed according to the design requirements during grounding construction. If there are no specific requirements for the design, the following requirements shall be followed.
(1)熱鍍鋅電纜橋之間可以將鍍鋅連接板用作道岔,使橋相結(jié)合,在連接板兩端的兩根連接螺栓上安裝鍍鋅彈簧墊圈。
(1) Galvanized connecting plates can be used as turnouts between hot-dip galvanized cable bridges to integrate the bridge. Galvanized spring washers are installed on two connecting bolts at both ends of the connecting plates.
(2)涂裝和注塑成型以及涂裝其他絕緣物的橋梁使用軟銅線過渡。
(2) Soft copper wire transition shall be used for bridges coated and injection molded and coated with other insulation.
連接用螺栓請(qǐng)鍍鋅,連接引線端子和橋梁的接觸部位請(qǐng)去除絕緣涂層,涂布防銹導(dǎo)電膏。或者委托制造商在橋梁上焊接銅墊圈,保證電纜橋梁之間的連接可靠。
The connecting bolts shall be galvanized, and the contact parts between the connecting lead terminals and the bridge shall be removed with insulating coating and coated with antirust conductive paste. Or entrust the manufacturer to weld copper washers on the bridge to ensure reliable connection between cable bridges.
(3)橋梁通過建筑物的變形狹縫和直線段超過30m,設(shè)置補(bǔ)償裝置,在橋梁的間歇兩端用軟銅線渡過,留下伸縮余量。關(guān)于振動(dòng)的場(chǎng)所,請(qǐng)?jiān)诮拥夭康倪B接部位安裝線圈。
(3) When the bridge passes through the deformation slit and straight section of the building for more than 30m, compensation devices shall be set, and soft copper wires shall be used at both ends of the bridge at intervals to leave expansion allowance. For places with vibration, please install the coil at the connection part of the grounding part.
2.設(shè)計(jì)要求橋梁作為接地干線的一部分時(shí),電纜橋梁安裝規(guī)范在接頭上的連接電阻請(qǐng)控制在0.00033以下。如果利用橋梁連接板不滿足這個(gè)要求,即使是鍍鋅橋梁,也適用符合設(shè)計(jì)要求的軟銅線過渡。
2. When the design requires that the bridge is a part of the grounding trunk line, the connection resistance on the joint of the cable bridge installation specification should be controlled below 0.00033. If the use of bridge connecting plates does not meet this requirement, even galvanized bridges are suitable for soft copper wire transition meeting the design requirements.
3.橋梁系統(tǒng)需要有可靠的電連接,電纜橋梁從始端到終端,至少有一處與接地干線可靠連接。沿著橋全長(zhǎng)另行鋪設(shè)接地干線時(shí),各段(包括非線性段)的橋需要至少有一點(diǎn)與接地干線可靠連接。
3. The bridge system needs reliable electrical connection. At least one part of the cable bridge is reliably connected with the grounding trunk line from the beginning to the end. When laying another grounding trunk line along the whole length of the bridge, the bridge of each section (including non-linear section) needs to be reliably connected with the grounding trunk line at least at one point.
4.熱鍍鋅橋梁之間可以利用鍍鋅連接板作為道岔,將橋梁連接成一體。在連接板兩端的2根連接螺栓上安裝鍍鋅彈簧墊圈,在橋梁之間用4mm以上的軟銅線連接,連接橋梁和接地線形成電氣通路。整個(gè)橋梁和接地干線需要兩處以上的連接。
4. Galvanized connecting plates can be used as turnouts between hot-dip galvanized bridges to connect the bridges as a whole. Install galvanized spring washers on the two connecting bolts at both ends of the connecting plate, connect the bridges with flexible copper wires of more than 4mm, and connect the bridge and the grounding wire to form an electrical path. The whole bridge and grounding trunk line need more than two connections.
以上就是山東電纜橋架在接地施工時(shí)要注意的幾個(gè)要點(diǎn),電纜的安裝需要有嚴(yán)格的規(guī)范進(jìn)行操作,電纜在安裝時(shí)可以跟具相應(yīng)的規(guī)范進(jìn)行操作,如果安裝時(shí)出現(xiàn)一些問題則需要及時(shí)進(jìn)行處理,尤其在進(jìn)行接地施工時(shí),因?yàn)榘娋€的連接沒需要格外注意。
The above are the key points to pay attention to in the grounding construction of Shandong cable bridge. The cable installation needs to be operated in strict specifications. The cable can be operated with corresponding specifications during installation. If there are some problems during installation, they need to be handled in time, especially in the grounding construction, because the connection of wires does not need special attention.
工程案例 / Case Show
  • 濟(jì)南火車站 濟(jì)南火車站
  • 曲阜孔子文化會(huì)展中心 曲阜孔子文化會(huì)展中心
  • 山東工藝美院 山東工藝美院
  • 公安廳服務(wù)展示 公安廳服務(wù)展示
推薦資訊 / Recommended news
  • 梯式橋架:工業(yè)動(dòng)力的“呼吸”骨架梯式橋架:工業(yè)動(dòng)力的“呼吸”骨架

    在建筑電氣與工業(yè)廠房的龐大系統(tǒng)中,電纜橋架猶如人體的血管,負(fù)責(zé)輸送持續(xù)供應(yīng)的動(dòng)力與信號(hào)。而在眾多橋架類型中,梯式橋架憑借其獨(dú)特的結(jié)構(gòu)設(shè)計(jì),成為了大截面動(dòng)力電纜的絕佳載體。In the vast sys

    TIME:2026-06-22